新天铁中厚板复产项目--燃气管道支架用钢材招标申请

内容
 
发送至邮箱

新天铁中厚板复产项目--燃气管道支架用钢材招标申请

I、Project overview
Item number:ZBCG*
Project name:新天铁中厚板复产项目--燃气管道支架用钢材招标申请
project type:Directional bidding
Issued by:Degong Construction
Released by:Purchasing Department

II、Bidder must log inthe cloud procurement bidding platform Be sure to complete the registration and obtain bidding qualification before the bid opening to conduct bidding and bid opening activities. The bid winning situation will be announced on this website.
III、Online bidding method: For specific steps, please refer to the "Service Guide" on the homepage of the website.
IV、Bid bond payment information
1、margin(yuan):*.0
2、Account name:
3、account opening bank:
4、Account number:
5、Row number:
6、In case of any conflict between the above contents and the contents of bidding documents, the contents of bidding documents shall prevail.

V、Bid deadline and opening time
1、Bid deadline:2022-09-19 14:55:00
2、bid opening time:2022-09-19 15:00:00
3、Bidders shall successfully submit all electronic bidding documents on the cloud procurement bidding platform before the bid deadline, and overdue will not be accepted.

VI、attachment information
TitleRelevant documents

VII、Clarification attachment
TitleRelevant documents

、Target information
material codematerial namespecification and modelUnit of measurementpurchase quantityused byRequirement note
等边角钢 75*6 7.2 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=25 3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 100*10 0.7 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 70*6 2 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈窄翼缘〉 HN200×100a 3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW300×300a 8.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW200×200a 21 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈中翼缘〉 HM400×300 4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈窄翼缘〉 HN800×300b 1.6 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈中翼缘〉 HM450×300 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW150×150 1.4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW100×100 2.3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
DN25焊管 壁厚3.2mm,Q235 0.4 The engineering dept. 楼梯栏杆用,没有压力要求
焊管Q235 φ50×2.5 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
焊管Q235 φ33.5×3.25 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁豆形花纹钢板 δ=6 12.3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
槽钢 [16a 1 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁钢(带钢) -100×6 0.7 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁钢(带钢) -30×3 0.18 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=8 7.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=12 0.4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 100*6 9 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担

信息源地址:https://www.yun-zhaocai.com/System/selectTenderListByGonggao?pageNum=1&pageSize=10&systemId=
I、Project overview
Item number:ZBCG*
Project name:新天铁中厚板复产项目--燃气管道支架用钢材招标申请
project type:Directional bidding
Issued by:Degong Construction
Released by:Purchasing Department

II、Bidder must log inthe cloud procurement bidding platform Be sure to complete the registration and obtain bidding qualification before the bid opening to conduct bidding and bid opening activities. The bid winning situation will be announced on this website.
III、Online bidding method: For specific steps, please refer to the "Service Guide" on the homepage of the website.
IV、Bid bond payment information
1、margin(yuan):*.0
2、Account name:
3、account opening bank:
4、Account number:
5、Row number:
6、In case of any conflict between the above contents and the contents of bidding documents, the contents of bidding documents shall prevail.

V、Bid deadline and opening time
1、Bid deadline:2022-09-19 14:55:00
2、bid opening time:2022-09-19 15:00:00
3、Bidders shall successfully submit all electronic bidding documents on the cloud procurement bidding platform before the bid deadline, and overdue will not be accepted.

VI、attachment information
TitleRelevant documents

VII、Clarification attachment
TitleRelevant documents

、Target information
material codematerial namespecification and modelUnit of measurementpurchase quantityused byRequirement note
等边角钢 75*6 7.2 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=25 3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 100*10 0.7 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 70*6 2 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈窄翼缘〉 HN200×100a 3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW300×300a 8.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW200×200a 21 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈中翼缘〉 HM400×300 4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈窄翼缘〉 HN800×300b 1.6 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈中翼缘〉 HM450×300 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW150×150 1.4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
热轧H型钢〈宽翼缘〉 HW100×100 2.3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
DN25焊管 壁厚3.2mm,Q235 0.4 The engineering dept. 楼梯栏杆用,没有压力要求
焊管Q235 φ50×2.5 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
焊管Q235 φ33.5×3.25 0.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁豆形花纹钢板 δ=6 12.3 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
槽钢 [16a 1 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁钢(带钢) -100×6 0.7 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
扁钢(带钢) -30×3 0.18 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=8 7.5 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
钢板 δ=12 0.4 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担
等边角钢 100*6 9 The engineering dept. 货到收货地后进行过磅检斤,费用由供货方承担

信息源地址:https://www.yun-zhaocai.com/System/selectTenderListByGonggao?pageNum=1&pageSize=10&systemId=
    
查看详情》
相关推荐
 

招投标大数据

查看详情

收藏

首页

最近搜索

热门搜索