宁夏回族自治区国家能源集团物资公司宁夏煤业10万吨/年EVA项目和MTP工艺技术升级改造项目10万吨/年EVA装置釜式反应器及搅拌器公开招标国际招标澄清或变更公告8包
宁夏回族自治区国家能源集团物资公司宁夏煤业10万吨/年EVA项目和MTP工艺技术升级改造项目10万吨/年EVA装置釜式反应器及搅拌器公开招标国际招标澄清或变更公告8包
澄清或变更简要说明:各投标人:
现对 (略) 宁夏煤业*吨/年EVA项目和MTP工艺技术升级改造项目*吨/年EVA装置釜式反应器及搅拌器公开招标(招标编号:0744-244CEZB*)招标文件做如下澄清说明:
UHDE as part of the Thyssenkrupp corporation is not in a position to accept
Chinese Law as applicable law in conjunction with arbitration in China.
=> We require a neutral law and a neutral place like Singapore.
答复:维持招标文件要求。
Technical
Section 8, chapter 7.1 (3)
There is no reference on the global market that meets these criteria. Furthermore, as a
manufacturer of components, it is not possible for us to provide specifications for the
design of process details under
-
Bearing life time is according to process conditions and in hand of plant operator.
A reasonable life time of bearings is around 4.000 – 8.000 hours.
答复:同意轴承使用寿命保证时间。
A requested life span of reactor motor of 20 years is not obtainable on the
market, due to process conditions during operation.
Section 8, chapter 7.2 (1)
答复:删除反应釜电机性能保证时间。
Process flow chart as well as control circuit and interlocking is part of licensor
scope.
答复:删除工艺流程图 (略) 及联锁。
Delivery Time (20 months, CIF)
As the world largest supplier of autoclave systems Uhde is fully booked for
deliveries in the next two years
=> We require you to extend the delivery time for two autoclave systems to 32 months FOB.
答复:维持招标文件要求。
请在收到此澄清后,将澄清回执上传国家 (略) 。
国家能源集团 (略)
二〇二四年五月二十一日
国家能源集团 (略) 受招标人委托对下列产品及服务进行国际公开竞争性招标,于2024-05-21在发布变更公告。本次招标采用传统招标方式,现邀请合格投标人参加投标。
1、招标条件
项目概况:详见第八章
资金到位或资金来源落实情况:资金自筹
项目已具备招标条件的说明:已具备
2、招标内容
招标项目编号:0744-244CEZB*
招标项目名称: (略) 宁夏煤业*吨/年EVA项目和MTP工艺技术升级改造项目*吨/年EVA装置釜式反应器及搅拌器公开招标
项目实施地点:中国宁夏回族自治区
招标产品列表(主要设备):
序号 | 产品名称 | 数量 | 简要技术规格 | 备注 |
1 | 釜式反应器及搅拌器 | 2套 | 详见第八章 | 01包 |
澄清或变更简要说明:各投标人:
现对 (略) 宁夏煤业*吨/年EVA项目和MTP工艺技术升级改造项目*吨/年EVA装置釜式反应器及搅拌器公开招标(招标编号:0744-244CEZB*)招标文件做如下澄清说明:
UHDE as part of the Thyssenkrupp corporation is not in a position to accept
Chinese Law as applicable law in conjunction with arbitration in China.
=> We require a neutral law and a neutral place like Singapore.
答复:维持招标文件要求。
Technical
Section 8, chapter 7.1 (3)
There is no reference on the global market that meets these criteria. Furthermore, as a
manufacturer of components, it is not possible for us to provide specifications for the
design of process details under
-
Bearing life time is according to process conditions and in hand of plant operator.
A reasonable life time of bearings is around 4.000 – 8.000 hours.
答复:同意轴承使用寿命保证时间。
A requested life span of reactor motor of 20 years is not obtainable on the
market, due to process conditions during operation.
Section 8, chapter 7.2 (1)
答复:删除反应釜电机性能保证时间。
Process flow chart as well as control circuit and interlocking is part of licensor
scope.
答复:删除工艺流程图 (略) 及联锁。
Delivery Time (20 months, CIF)
As the world largest supplier of autoclave systems Uhde is fully booked for
deliveries in the next two years
=> We require you to extend the delivery time for two autoclave systems to 32 months FOB.
答复:维持招标文件要求。
请在收到此澄清后,将澄清回执上传国家 (略) 。
国家能源集团 (略)
二〇二四年五月二十一日
国家能源集团 (略) 受招标人委托对下列产品及服务进行国际公开竞争性招标,于2024-05-21在发布变更公告。本次招标采用传统招标方式,现邀请合格投标人参加投标。
1、招标条件
项目概况:详见第八章
资金到位或资金来源落实情况:资金自筹
项目已具备招标条件的说明:已具备
2、招标内容
招标项目编号:0744-244CEZB*
招标项目名称: (略) 宁夏煤业*吨/年EVA项目和MTP工艺技术升级改造项目*吨/年EVA装置釜式反应器及搅拌器公开招标
项目实施地点:中国宁夏回族自治区
招标产品列表(主要设备):
序号 | 产品名称 | 数量 | 简要技术规格 | 备注 |
1 | 釜式反应器及搅拌器 | 2套 | 详见第八章 | 01包 |